#27
|
|||
|
|||
You probably know how long this takes! I hope to have all the wiring done in 1-2 days and get the engine in place, then I'll start on the cooling system and piecing together hoses to make everything fit.
__________________
J.D. in Reno 1958 Mercedes 180D (rebuilding now) 1985 VW Jetta 1.6TD 1985 Volvo 745 Wagon 2.4TD (sold but still maintain it) 1987 VW Quantum Syncro 2.2 (converting to 2.0TD) 1996 TDI Passat 1997 Chevy 3/4 ton 6.5TD 2006 V10 TDI Touareg |
|
|